Training Long Lead Reflective Orange 5m x 25mm
Hem and Boo Sports Training Long Lead – Reflective Orange (5m x 25mm) Master distance commands and perfect your dog's recall with the Hem and Boo Sports Training Long Lead. Designed in a high-visibility reflective orange, this...
Guarantee Safe Checkout
Training Long Lead Reflective Orange 5m x 25mm
Pairs well with
Hem and Boo Sports Training Long Lead – Reflective Orange (5m x 25mm)
Master distance commands and perfect your dog's recall with the Hem and Boo Sports Training Long Lead. Designed in a high-visibility reflective orange, this 5-metre lead gives your dog the freedom to explore safely while you maintain total control during outdoor training sessions.
Crafted from tightly woven nylon, this lead is exceptionally strong, durable, and built to withstand active outdoor use. The sporty finish ensures a comfortable grip, while the integrated reflective stitching provides essential visibility and safety during early morning or late evening walks in low-light conditions.
Key Features:
- Recall & Distance Training: The 5-metre length provides the ideal distance for practicing recall, stay, and field control commands with confidence.
- High-Visibility Reflective Design: Bright orange webbing with woven reflective detail ensures high visibility during low-light, autumn, and nighttime walks.
- Durable Tightly Woven Nylon: Built from heavy-duty, tightly woven webbing that offers maximum strength and long-lasting performance.
- Sporty & Comfortable Grip: Lightweight yet sturdy design ensures a comfortable hold during intensive training sessions.
Specifications
| Attribute | Details |
|---|---|
| Brand Range | Hem and Boo Sports |
| Length | 5 Metres (5M) |
| Width | 25mm |
| Colour | Reflective Orange |
| Material | Tightly Woven Nylon |
Delivery & Postage Information
Everything you need to know about our shipping options, rates, and holiday schedules.
Standard Delivery Rates
| Order Type / Weight | Delivery Fee |
|---|---|
| Standard Orders (Up to 2kg) | £4.99 |
| Larger Orders (2kg or over) | £7.99 |
| Orders £45 or More (Mainland UK) | FREE Delivery |
Delivery Options
1. Click & Collect (Free)
Order and reserve your items online, then select your preferred store. Our team will contact you directly as soon as your order is ready for collection.
2. Home or Work Delivery
Dispatched quickly via DPD. DPD will notify you with full tracking details.
*Tip: Add your mobile number at checkout to receive a 1-hour delivery window.Delivery Times & Support
Deliveries are normally made within 2 working days of dispatch. You will receive a confirmation email with full tracking details once your order leaves our warehouse.
Highlands, Islands & Excluded Areas
Deliveries to the postcodes below are charged at £18.99 for up to 28kg, plus £18.99 for every additional 28kg. (Free delivery over £45 does not apply to these regions).
Areas We Currently Cannot Deliver To:
- Northern Ireland & Republic of Ireland
- Guernsey (GY1 – GY9) & Jersey (JE1 – JE4)
- Isles of Scilly (TR21 – TR25)
- BFPO Addresses (BFPO1 – BFPO999)
Christmas Delivery Schedule
- Courier Volumes: While 98% of deliveries arrive within 1–3 working days, couriers experience heavy volumes during Christmas, which may cause minor delays.
- Festive Click & Collect: Click & Collect remains available across all stores throughout the festive week.
- Out of Stock Items: If an ordered item is out of stock, we will dispatch it as quickly as possible. Please note that supplier closures over the holidays may delay restocks until the first week of January.