{"product_id":"training-long-lead-reflective-orange-5m-x-25mm","title":"Training Long Lead Reflective Orange 5m x 25mm","description":"\u003ch2\u003eHem and Boo Sports Training Long Lead – Reflective Orange (5m x 25mm)\u003c\/h2\u003e\n\n\u003cp style=\"margin-bottom: 20px;\"\u003eMaster distance commands and perfect your dog's recall with the Hem and Boo Sports Training Long Lead. Designed in a high-visibility reflective orange, this 5-metre lead gives your dog the freedom to explore safely while you maintain total control during outdoor training sessions.\u003c\/p\u003e\n\n\u003cp style=\"margin-bottom: 25px;\"\u003eCrafted from tightly woven nylon, this lead is exceptionally strong, durable, and built to withstand active outdoor use. The sporty finish ensures a comfortable grip, while the integrated reflective stitching provides essential visibility and safety during early morning or late evening walks in low-light conditions.\u003c\/p\u003e\n\n\u003ch3 style=\"margin-top: 30px; margin-bottom: 15px;\"\u003eKey Features:\u003c\/h3\u003e\n\u003cul style=\"margin-bottom: 30px; padding-left: 20px;\"\u003e\n  \u003cli style=\"margin-bottom: 10px;\"\u003e\n\u003cstrong\u003eRecall \u0026amp; Distance Training:\u003c\/strong\u003e The 5-metre length provides the ideal distance for practicing recall, stay, and field control commands with confidence.\u003c\/li\u003e\n  \u003cli style=\"margin-bottom: 10px;\"\u003e\n\u003cstrong\u003eHigh-Visibility Reflective Design:\u003c\/strong\u003e Bright orange webbing with woven reflective detail ensures high visibility during low-light, autumn, and nighttime walks.\u003c\/li\u003e\n  \u003cli style=\"margin-bottom: 10px;\"\u003e\n\u003cstrong\u003eDurable Tightly Woven Nylon:\u003c\/strong\u003e Built from heavy-duty, tightly woven webbing that offers maximum strength and long-lasting performance.\u003c\/li\u003e\n  \u003cli style=\"margin-bottom: 10px;\"\u003e\n\u003cstrong\u003eSporty \u0026amp; Comfortable Grip:\u003c\/strong\u003e Lightweight yet sturdy design ensures a comfortable hold during intensive training sessions.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3 style=\"margin-top: 30px; margin-bottom: 15px;\"\u003eSpecifications\u003c\/h3\u003e\n\u003ctable style=\"width: 100%; border-collapse: collapse; margin-top: 15px; margin-bottom: 35px;\"\u003e\n  \u003cthead\u003e\n    \u003ctr style=\"background-color: #f8f9fa;\"\u003e\n      \u003cth style=\"border: 1px solid #dddddd; padding: 14px; text-align: left;\"\u003eAttribute\u003c\/th\u003e\n      \u003cth style=\"border: 1px solid #dddddd; padding: 14px; text-align: left;\"\u003eDetails\u003c\/th\u003e\n    \u003c\/tr\u003e\n  \u003c\/thead\u003e\n  \u003ctbody\u003e\n    \u003ctr\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e\u003cstrong\u003eBrand Range\u003c\/strong\u003e\u003c\/td\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003eHem and Boo Sports\u003c\/td\u003e\n    \u003c\/tr\u003e\n    \u003ctr style=\"background-color: #fdfdfd;\"\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e\u003cstrong\u003eLength\u003c\/strong\u003e\u003c\/td\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e5 Metres (5M)\u003c\/td\u003e\n    \u003c\/tr\u003e\n    \u003ctr\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e\u003cstrong\u003eWidth\u003c\/strong\u003e\u003c\/td\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e25mm\u003c\/td\u003e\n    \u003c\/tr\u003e\n    \u003ctr style=\"background-color: #fdfdfd;\"\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e\u003cstrong\u003eColour\u003c\/strong\u003e\u003c\/td\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003eReflective Orange\u003c\/td\u003e\n    \u003c\/tr\u003e\n    \u003ctr\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003e\u003cstrong\u003eMaterial\u003c\/strong\u003e\u003c\/td\u003e\n      \u003ctd style=\"border: 1px solid #dddddd; padding: 14px;\"\u003eTightly Woven Nylon\u003c\/td\u003e\n    \u003c\/tr\u003e\n  \u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003cdiv style=\"background-color: #fff9f5; border-left: 4px solid #ff6f00; padding: 20px; border-radius: 4px; font-style: italic; margin-top: 25px;\"\u003e\n  \u003cstrong\u003eTraining Tip:\u003c\/strong\u003e For safer long-line recall training, attach long leads to a well-fitted harness rather than a neck collar to prevent sudden jerks to your dog's neck!\n\u003c\/div\u003e","brand":"pet-placestore","offers":[{"title":"5m","offer_id":58094971060559,"sku":"00910982","price":15.99,"currency_code":"GBP","in_stock":true},{"title":"10m","offer_id":58277777375567,"sku":"00910983","price":17.99,"currency_code":"GBP","in_stock":false},{"title":"15m","offer_id":58277777408335,"sku":"00910984","price":18.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0981\/0991\/5471\/files\/00910982-large.jpg?v=1782842391","url":"https:\/\/www.petplace.co.uk\/products\/training-long-lead-reflective-orange-5m-x-25mm","provider":"petplace","version":"1.0","type":"link"}